Fast Start: The Myriad Turbine Concept
October 2022 - April 2023
The Myriad Turbine Concept
The Fast Start project was funded by Innovate UK and allowed the team to detail the conceptual design elements of the Myriad Turbine. This early work provided a springboard for Myriad, allowing the founders the time to flesh out a high level concept design of the Myriad Turbine, moving the technology to TRL 2. This was the opportunity to build on the ideas that the company was founded upon.
The project included extensive stakeholder engagement to ensure that design choices tackle the things that are most important to the wind industry. High level system and subsystem designs were conducted and a detailed feasibility study of the Myriad concept was conducted.
The Fast Start project resulted in a conceptual design that forms the basis of later detailed design work.