
FRAME Project
The Scottish Enterprise funded FRame Assembly and Maintenance Enhancement (FRAME) project followed the Fast Start project, and progressed the Myriad Turbine to TRL3

Fast Start: The Myriad Turbine Concept
The Fast Start project was funded by Innovate UK and allowed the team to detail the conceptual design elements of the Myriad turbine. This early work provided a springboard for Myriad, allowing the founders the time to flesh out a high level concept design of the Myriad Turbine, moving the technology to TRL 2.